Nalco Water was built on boilers. We've worked in thousands of boiler plants, asking and listening, auditing and sampling for 80 years. Now we've pushed far beyond traditional performance boundaries to help our customers produce safe, reliable, cost-effective steam.
The Nalco Corrosion Stress Monitor™ responds to preboiler corrosion stress in real time, delivering the correct dosage of oxygen scavenger or passivator. The 3D TRASAR Boiler System then uses fluorescence technology to prevent scale formation inside your boiler. 3D TRASAR Boiler Technology also identifies potential causes of system variability and abnormal conditions, making it a powerful diagnostic tool.
Delivers:
A large university improved sustainability, saving $26,000 per year in energy and water savings from improved management of boiler blowdown.
The Nalco Water Corrosion Stress Monitor helped an electric power plant reduce the cost of boiler shutdown and startup by approximately $700,000 per incident, through a combination of:
A paper mill avoided $430,000 per day in lost production by minimising boiler outages related to preboiler corrosion failures.
A specialty tire manufacturer improved competitive advantage in several ways: